EBC Annex 50 Prefabricated Systems for Low Energy Renovation of Residential Buildings

 

Status: Completed (2006-2011)

Operating Agent: Mr Mark Zimmermann, EMPA-ZEN, Überlandstrasse 129, CH 8600 Dübendorf, SWITZERLAND
Tel: +41 (0) 44 823 4118
Fax: +41 (0) 44 823 4009
Email: mark.zimmermann[at]empa.ch

Website: www.empa-ren.ch/A50.htm

 

Summary

Energy conservation is largely dominated by existing buildings. In most industrialized countries new buildings will only contribute 10% - 20 % additional energy consumption by 2050 whereas more than 80% will be influenced by the existing building stock. If building renovation continues at the current rate and with the present common policy, between one to over four centuries will be necessary to improve the building stock to the energy level of current new construction.

Currently, most present building renovations address isolated building components, such as roofs, façades or heating systems. This often results in inefficient and in the end expensive solutions, without an appropriate long term energy reduction. Optimal results can not be achieved by single renovation measures and new problems could arise, including local condensation or overheating.

The objectives are the development and demonstration of an innovative whole building renovation concept for typical apartment buildings based on:
Prototype, prefabricated roof systems with integrated HVAC, hot water and solar systems,Highly insulated envelopes with integrated new distribution systems for heating, cooling and ventilation.

The advantages of these prototypes include:

Achieving energy efficiency and comfort for existing apartment buildings comparable to new advanced low energy buildings;Optimised constructions and quality and cost efficiency due to prefabrication;Opportunity to create attractive new living space in the prefabricated attic space and by in-corporating existing balconies into the living space;A quick renewal process with minimised disturbances for the inhabitants.

The project has been structured according to the following five research areas:

–  

Concept definition and specification

Integrated roof systems

HVAC and solar systems

Façade elements

Monitoring and dissemination

 

Participants: Austria, Czech Republic, France, the Netherlands, Portugal, Sweden, Switzerland

Publications

Factsheet

Project Summary Report
Mark Zimmermann, 2012, AECOM Ltd, United Kingdom
Download

Retrofit Strategies Design Guide - Advanced Retrofit Strategies and 10 Steps to a Prefab Module
Edited by Peter Schwehr, Robert Fischer and Sonja Geier
March 2011, Empa - Swiss Federal Laboratories for Materials Science and Technology Download

IEA ECBCS Annex 50: Prefabricated Systems for Low Energy Renovation of Residential Buildings
Building Renovation Case Studies
Reto Miloni, Nadja Grischott, Mark Zimmermann, Chiel Boonstra, Sonja Geier, Karl Höfler, David Venus: Building Renovation Case Studies, ISBN 978-3-905594-61-4, March 2011 Download

Project Summary Report
A synthesis report for a broad audience, demonstrating the potential of prefabricated retrofit Download